New pages
From Fast CCD Detector
Jump to navigationJump to search- 22:09, 1 March 2012 To Do List (hist | edit) [4,011 bytes] Weizeor (talk | contribs) (Initial TO DO list)
- 20:38, 1 March 2012 Log of Problems and Solutions (hist | edit) [1,355 bytes] Weizeor (talk | contribs) (Initial)
- 20:18, 1 March 2012 Status (hist | edit) [739 bytes] Weizeor (talk | contribs) (Created page with "2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process. 2-29-2012 Plan on using front side 1K FTFCCD")
- 19:52, 1 March 2012 1K Frame Transfer Fast CCD (hist | edit) [115 bytes] Weizeor (talk | contribs) (Initial)