Difference between revisions of "Beamline Controls"

From Beam Line Controls
Jump to navigation Jump to search
(Add the APSU PVs section.)
 
(One intermediate revision by one other user not shown)
Line 15: Line 15:
* [[Controls Software Documentation]]
* [[Controls Software Documentation]]
* [[Hardware and IT Configuration]]
* [[Hardware and IT Configuration]]
* [[APSU_PVs]]: Description of what process variables(PVs) have changed for PSS, EPS, and ID control for the APSU beamlines
** Mark Rivers has documented the process he used to find the relevant medm screens and the useful PVs for his beamline:
*** https://github.com/CARS-UChicago/GSECARS-EPICS/blob/master/docs/EPICS_Beamline_PVs.docx
*** https://github.com/CARS-UChicago/GSECARS-EPICS/blob/master/docs/EPICS_Beamline_PVs.pdf


===Practical Beamline Controls Training (2023)===
===Practical Beamline Controls Training (2023)===
Line 28: Line 32:


* Current chairs:
* Current chairs:
** Kevin Peterson (XSD-BC)
** Tejas Guruswamy (XSD-DET)
** Tejas Guruswamy (XSD-DET)
** Andrew Chuang (XSD-MPE)
** Keenan Lang (XSD-BC)
** Victoria Cooley (XSD-MPE)


===Beamline Data Pipelines===
===Beamline Data Pipelines===


* https://git.aps.anl.gov/groups/bdp-public/-/wikis/home
* https://git.aps.anl.gov/groups/bdp-public/-/wikis/home
===Beamline APSU PVs===
* [[APSU_PVs]]: Description of what process variables(PVs) have changed for PSS, EPS, and ID control for the APSU beamlines
* Mark Rivers has documented the process he used to find the relevant medm screens and the pertinent PVs for his beamlines:
** https://github.com/CARS-UChicago/GSECARS-EPICS/blob/master/docs/EPICS_Beamline_PVs.docx
** https://github.com/CARS-UChicago/GSECARS-EPICS/blob/master/docs/EPICS_Beamline_PVs.pdf

Latest revision as of 19:27, 13 August 2024

WIKI for the APS Beamline Controls Community, maintained by the Beamline Controls Technical Working Group.
This wiki exists to collect the output of the working group, including documentation on beamline controls software and hardware useful for APS beamline scientists and resident users.


Getting Started

Beamline Controls Documentation

Practical Beamline Controls Training (2023)

Session 1: IOC Basics Session 2: IOC Deployment & Troubleshooting

Beamline Controls Technical Working Group information

The BC Technical Working (BCTWG) group meets monthly to review and gather feedback on possible changes in either the way BC delivers support or the technologies that BC supports. The BCTWG comprises the BC group plus interested stakeholders from XSD. In a nutshell, the main goal of the BCTWG is to improve communication between BC and its customers on topics of mutual interest.

  • Box folder with slides and meeting notes (ANL only): [1]
  • Current chairs:
    • Tejas Guruswamy (XSD-DET)
    • Keenan Lang (XSD-BC)
    • Victoria Cooley (XSD-MPE)

Beamline Data Pipelines