Work Planning and Control

From EPICSWIKI
Revision as of 13:18, 8 August 2008 by NedArnold (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Work Planning and Control

Radiation Safety Systems

Work performed on Radiation Safety Systems must be formally approved through a Work Request and a CCWP. Detailed instructions for our group's RSS systems are found in the AOI descriptions:

* BESOCM Trigger Select
* Controlled Access System

Shutdown Work Planning

All shutdown work is planned, evaluated, authorized and tracked using this trac application:

* Controls Group Shutdown Work Task Trac-er

Staff Task Assignments

Staff assignments are planned, evaluated, authorized and tracked using this trac application:

* Controls Group Task Trac-er