Work Planning and Control
From EPICSWIKI
Work Planning and Control
Radiation Safety Systems
Work performed on Radiation Safety Systems must be formally approved through a Work Request and a CCWP. Detailed instructions for our group's RSS systems are found in the AOI descriptions:
Electrical Work Guidance and Authorization
Systems with Elevated Risk
- Replacing VME/VXI Fuses or Power Supplies
- Allen Bradley P4S Power Supply Module
- LINAC Flag Actuator Chassis (ACC100)
- Ionpak Controller Chassis (IPC100)
- ID Control Hazards and Remediation
Shutdown Work Planning
All shutdown work is planned, evaluated, authorized and tracked using this trac application:
Staff Task Assignments
Staff assignments are planned, evaluated, authorized and tracked using this trac application: