Work Planning and Control

From EPICSWIKI
Revision as of 16:17, 8 August 2008 by NedArnold (talk | contribs)

Work Planning and Control

Radiation Safety Systems

Work performed on Radiation Safety Systems must be formally approved through a Work Request and a CCWP. Detailed instructions for our group's RSS systems are found in the AOI descriptions:


Electrical Work Guidance and Authorization

Systems with Elevated Risk

Shutdown Work Planning

All shutdown work is planned, evaluated, authorized and tracked using this trac application:

Staff Task Assignments

Staff assignments are planned, evaluated, authorized and tracked using this trac application:


Validation Procedures

Quality Assurance