Difference between revisions of "Policies and Procedure"
From EPICSWIKI
Line 9: | Line 9: | ||
== Group Controlled Procedures == | == Group Controlled Procedures == | ||
Do I really want to maintain this list?? | |||
* APS Standard Procedure for IOC Applications | |||
* PLC Application Management System (PAMS) | |||
* Component-type Documentation Procedure | |||
* APS Site-wide Process Variable Naming Convention | |||
* PV Rename Procedure | |||
* Validation Procedures | |||
== Reminders on Conventions for Development, Deployment, and Documentation == | == Reminders on Conventions for Development, Deployment, and Documentation == | ||
* | * |
Revision as of 18:37, 8 August 2008
Document Central
Document Central is a public repository for controlled documents essential to the safety and operation of the Advanced Photon Source.
Division Controlled Procedures
Lists of the formal procedures (administered by the division)
Group Controlled Procedures
Do I really want to maintain this list??
- APS Standard Procedure for IOC Applications
- PLC Application Management System (PAMS)
- Component-type Documentation Procedure
- APS Site-wide Process Variable Naming Convention
- PV Rename Procedure
- Validation Procedures