Difference between revisions of "Work Planning and Control"
From EPICSWIKI
Line 5: | Line 5: | ||
* [http://ctlappsirmis/irmis2/aoi/aoi_edit_basic_search_results.php?aoiName=aoi_linac_besocm_trigger-select&aoiId=4 BESOCM Trigger Select] | * [http://ctlappsirmis/irmis2/aoi/aoi_edit_basic_search_results.php?aoiName=aoi_linac_besocm_trigger-select&aoiId=4 BESOCM Trigger Select] | ||
* [http://ctlappsirmis/irmis2/aoi/aoi_edit_basic_search_results.php?aoiName=aoi_site_acis_controlled-access&aoiId=195 Controlled Access System] | * [http://ctlappsirmis/irmis2/aoi/aoi_edit_basic_search_results.php?aoiName=aoi_site_acis_controlled-access&aoiId=195 Controlled Access System] | ||
=== Electrical Work Guidance and Authorization === | |||
=== Systems with Elevated Risk === | |||
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_Replacing%20VME_VXI_Fuse_PS.pdf Replacing VME/VXI Fuses or Power Supplies] | |||
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_1771P4SLineCordHazard.pdf Allen Bradley P4S Power Supply Module] | |||
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_acc100.pdf LINAC Flag Actuator Chassis (ACC100)] | |||
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_ipc100.pdf Ionpak Controller Chassis (IPC100)] | |||
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_ID%20Control%20Electrical%20Hazards.pdf ID Control Hazards and Remediation] | |||
=== Shutdown Work Planning === | === Shutdown Work Planning === | ||
Line 14: | Line 24: | ||
* [https://svn.aps.anl.gov/trac/controls/wiki Controls Group Task Trac-er] | * [https://svn.aps.anl.gov/trac/controls/wiki Controls Group Task Trac-er] | ||
=== Validation Procedures === | === Validation Procedures === | ||
=== Quality Assurance === | === Quality Assurance === |
Revision as of 16:17, 8 August 2008
Work Planning and Control
Radiation Safety Systems
Work performed on Radiation Safety Systems must be formally approved through a Work Request and a CCWP. Detailed instructions for our group's RSS systems are found in the AOI descriptions:
Electrical Work Guidance and Authorization
Systems with Elevated Risk
- Replacing VME/VXI Fuses or Power Supplies
- Allen Bradley P4S Power Supply Module
- LINAC Flag Actuator Chassis (ACC100)
- Ionpak Controller Chassis (IPC100)
- ID Control Hazards and Remediation
Shutdown Work Planning
All shutdown work is planned, evaluated, authorized and tracked using this trac application:
Staff Task Assignments
Staff assignments are planned, evaluated, authorized and tracked using this trac application: