== Work Planning and Control ==
== Radiation Safety Systems ==
Work performed on Radiation Safety Systems must be formally approved through a Work Request <b>and</b> a CCWP.  Detailed instructions for our group's RSS systems are found in the AOI descriptions:
* [http://ctlappsirmis/irmis2/aoi/aoi_edit_basic_search_results.php?aoiName=aoi_linac_besocm_trigger-select&aoiId=4 BESOCM Trigger Select]
* [http://ctlappsirmis/irmis2/aoi/aoi_edit_basic_search_results.php?aoiName=aoi_site_acis_controlled-access&aoiId=195 Controlled Access System]
 
 
== Electrical Work Guidance and Authorization ==


=== Radiation Safety Systems ===
== Systems with Elevated Risk ==
Work performed on Radiation Safety Systems must be formally approved through a Work Request <b>and</b> a CCWP. Detailed instructions for our group's RSS systems are found in the AOI descriptions:  
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_Replacing%20VME_VXI_Fuse_PS.pdf Replacing VME/VXI Fuses or Power Supplies]
* [http://ctlappsirmis/irmis2/aoi/aoi_edit_basic_search_results.php?aoiName=aoi_linac_besocm_trigger-select&aoiId=4 BESOCM Trigger Select]
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_1771P4SLineCordHazard.pdf Allen Bradley P4S Power Supply Module]
* [http://ctlappsirmis/irmis2/aoi/aoi_edit_basic_search_results.php?aoiName=aoi_site_acis_controlled-access&aoiId=195 Controlled Access System]
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_acc100.pdf LINAC Flag Actuator Chassis (ACC100)]
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_ipc100.pdf Ionpak Controller Chassis (IPC100)]
* [http://www.aps.anl.gov/asd/controls/group/procedures/EHR_ID%20Control%20Electrical%20Hazards.pdf ID Control Hazards and Remediation]


=== Shutdown Work Planning ===
== Shutdown Work Planning ==
All shutdown work is planned, evaluated, authorized and tracked using this <i>trac</i> application:   
All shutdown work is planned, evaluated, authorized and tracked using this <i>trac</i> application:   
* [https://svn.aps.anl.gov/trac/controls_sd/wiki Controls Group Shutdown Work Task Trac-er]
* [https://svn.aps.anl.gov/trac/controls_sd/wiki Controls Group Shutdown Work Task Trac-er]


=== Staff Task Assignments ===
== Staff Task Assignments ==
Staff assignments are planned, evaluated, authorized and tracked using this <i>trac</i> application:   
Staff assignments are planned, evaluated, authorized and tracked using this <i>trac</i> application:   
* [https://svn.aps.anl.gov/trac/controls/wiki Controls Group Task Trac-er]
* [https://svn.aps.anl.gov/trac/controls/wiki Controls Group Task Trac-er]
 
 
== Validation Procedures ==
== Quality Assurance ==

Latest revision as of 16:38, 8 August 2008

Radiation Safety Systems

Work performed on Radiation Safety Systems must be formally approved through a Work Request and a CCWP. Detailed instructions for our group's RSS systems are found in the AOI descriptions:


Electrical Work Guidance and Authorization

Systems with Elevated Risk

Shutdown Work Planning

All shutdown work is planned, evaluated, authorized and tracked using this trac application:

Staff Task Assignments

Staff assignments are planned, evaluated, authorized and tracked using this trac application:


Validation Procedures

Quality Assurance