TO DO

CIN Modules

  • LBNL to fill in?

Clock Module

  • Need to fully build 12 Clock Modules, LBNL will provide metal plates (3 per module)
  • Order 2 blank PCB

Top Module

  • LBNL to fill in

Digitizer Module

  • LBNL to fill in

Chiller

  • LBNL needs to build custom flex-cool probe heads and send to FTS Systems

Power Supply

ATCA Shelves

  • APS still waiting for 2 from Shelves from ZNYX.

GUI

  • Add fCRIC Timing waveforms
  • Sync/Update Exposure control when other data is sent down
  • One button to send file to FPGA and update GUI
  • Add fCRIC mask to GUI
  • Currenly when you send down a configuration file it does not update the GUI's waveforms, and bias windows, unless you are in the the waveform or bias window.
  • Allow user to choose which waveforms to view (will need when fCRIC waveforms are added)
  • Keep consolidating redundant routines


COMPLETED TASK

Vacuum Chambers

  • APS has two vacuum chambers built

Chiller System

  • LBNL has finished chiller system design and is in the process of building the flex-cool custom probe heads.
  • APS has started the process to order two systems.

GUI

  • Put under CVS control
  • Added image viewer
  • Added Expousre controls