CIN Modules
Build??
Clock Module
Need to fully build 12 Order 2 blank PCB
Top Module
?
Digitizer Module
?
Chiller
- LBNL needs to build custom flex-cool probe heads and send to FTS Systems
Power Supply
ATCA Shelves
APS still waiting for 2 from Shelves from ZNYX.
DONE
Vacuum Chambers
- APS has two vacuum chambers built
Chiller System
- LBNL has finished chiller system design and is in the process of building the flex-cool custom probe heads.