Difference between revisions of "To Do List"
From Fast CCD Detector
Jump to navigationJump to search (→GUI) |
(→GUI) |
||
Line 47: | Line 47: | ||
* Sync/Update Exposure control when other data is sent down | * Sync/Update Exposure control when other data is sent down | ||
* One button to send file to FPGA and update GUI | * One button to send file to FPGA and update GUI | ||
* Currenly when you send down a configuration file it does not update the GUI's waveforms, and bias windows, unless you are in the the waveform or bias window. |
Revision as of 22:38, 8 January 2013
TO DO
CIN Modules
- LBNL to fill in?
Clock Module
- 8-1-2012 Shipped 12 tested Clock Modules to LBL
- Need to fully build 12 Clock Modules, LBNL will provide metal plates (3 per module)
- Order 2 blank PCB
- 4-2-2012 PCBs ordered (15 days)
- 4-3-2012 Assembly ordered
Top Module
- LBNL to fill in
Digitizer Module
- LBNL to fill in
Chiller
- LBNL needs to build custom flex-cool probe heads and send to FTS Systems
Power Supply
ATCA Shelves
- APS still waiting for 2 from Shelves from ZNYX.
GUI
- Add fCRIC mask to GUI
- Currenly when you send down a configuration file it does not update the GUI's waveforms, and bias windows, unless you are in the the waveform or bias window.
- Allow user to choose which waveforms to view (will need when fCRIC waveforms are added)
- Keep consolidating redundant routines
COMPLETED TASK
Vacuum Chambers
- APS has two vacuum chambers built
Chiller System
- LBNL has finished chiller system design and is in the process of building the flex-cool custom probe heads.
- APS has started the process to order two systems.
GUI
- Put under CVS control
- Added image viewer
- Added Expousre controls
- Add fCRIC Timing waveforms
- Sync/Update Exposure control when other data is sent down
- One button to send file to FPGA and update GUI
- Currenly when you send down a configuration file it does not update the GUI's waveforms, and bias windows, unless you are in the the waveform or bias window.