Revision as of 20:54, 2 March 2012
TO DO
CIN Modules
- LBNL to fill in?
Clock Module
- Need to fully build 12 Clock Modules, LBNL will provide metal plates (3 per module)
- Order 2 blank PCB
Top Module
- LBNL to fill in
Digitizer Module
- LBNL to fill in
Chiller
- LBNL needs to build custom flex-cool probe heads and send to FTS Systems
Power Supply
ATCA Shelves
- APS still waiting for 2 from Shelves from ZNYX.
GUI
- Add fCRIC Timing waveforms
- Sync/Update Exposure control when other data is sent down
- One button to send file to FPGA and update GUI
- Add fCRIC mask to GUI
- Currenly when you send down a configuration file it does not update the GUI's waveforms, and bias windows, unless you are in the the waveform or bias window.
- Allow user to choose which waveforms to view (will need when fCRIC waveforms are added)
- Keep consolidating redundant routines
COMPLETED TASK
Vacuum Chambers
- APS has two vacuum chambers built
Chiller System
- LBNL has finished chiller system design and is in the process of building the flex-cool custom probe heads.
- APS has started the process to order two systems.
GUI
- Put under CVS control
- Added image viewer
- Added Expousre controls