Difference between revisions of "To Do List"
From Fast CCD Detector
Jump to navigationJump to search (Added more task and added bullets) |
|||
Line 2: | Line 2: | ||
=== CIN Modules === | === CIN Modules === | ||
* LBNL to fill in? | |||
=== Clock Module === | === Clock Module === | ||
Need to fully build 12 | *Need to fully build 12 Clock Modules, LBNL will provide metal plates (3 per module) | ||
Order 2 blank PCB | *Order 2 blank PCB | ||
=== Top Module === | === Top Module === | ||
* LBNL to fill in | |||
=== Digitizer Module === | === Digitizer Module === | ||
* LBNL to fill in | |||
=== Chiller === | === Chiller === | ||
Line 20: | Line 20: | ||
=== ATCA Shelves === | === ATCA Shelves === | ||
APS still waiting for 2 from Shelves from ZNYX. | *APS still waiting for 2 from Shelves from ZNYX. | ||
=== GUI === | |||
* Add fCRIC Timing waveforms | |||
* Sync/Update Exposure control when other data is sent down | |||
* One button to send file to FPGA and update GUI | |||
* Add fCRIC mask to GUI | |||
* Currenly when you send down a configuration file it does not update the GUI's waveforms, and bias windows, unless you are in the the waveform or bias window. | |||
* Allow user to choose which waveforms to view (will need when fCRIC waveforms are added) | |||
* Keep consolidating redundant routines | |||
== | == COMPLETED TASK == | ||
=== Vacuum Chambers === | === Vacuum Chambers === | ||
Line 31: | Line 39: | ||
*LBNL has finished chiller system design and is in the process of building the flex-cool custom probe heads. | *LBNL has finished chiller system design and is in the process of building the flex-cool custom probe heads. | ||
*APS has started the process to order two systems. | *APS has started the process to order two systems. | ||
=== GUI === | |||
* Put under CVS control | |||
* Added image viewer | |||
* Added Expousre controls |
Revision as of 20:53, 2 March 2012
TO DO
CIN Modules
- LBNL to fill in?
Clock Module
- Need to fully build 12 Clock Modules, LBNL will provide metal plates (3 per module)
- Order 2 blank PCB
Top Module
- LBNL to fill in
Digitizer Module
- LBNL to fill in
Chiller
- LBNL needs to build custom flex-cool probe heads and send to FTS Systems
Power Supply
ATCA Shelves
- APS still waiting for 2 from Shelves from ZNYX.
GUI
- Add fCRIC Timing waveforms
- Sync/Update Exposure control when other data is sent down
- One button to send file to FPGA and update GUI
- Add fCRIC mask to GUI
- Currenly when you send down a configuration file it does not update the GUI's waveforms, and bias windows, unless you are in the the waveform or bias window.
- Allow user to choose which waveforms to view (will need when fCRIC waveforms are added)
- Keep consolidating redundant routines
COMPLETED TASK
Vacuum Chambers
- APS has two vacuum chambers built
Chiller System
- LBNL has finished chiller system design and is in the process of building the flex-cool custom probe heads.
- APS has started the process to order two systems.
GUI
- Put under CVS control
- Added image viewer
- Added Expousre controls