Status

From Fast CCD Detector
Revision as of 20:18, 1 March 2012 by Weizeor (talk | contribs) (Created page with "2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process. 2-29-2012 Plan on using front side 1K FTFCCD")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process.

2-29-2012 Plan on using front side 1K FTFCCD