4-3-2012 First x-ray on back illuminated 1K Frame Shift CCD using final hardware configuration.  
4-3-2012 First x-ray on back illuminated 1K Frame Shift CCD using final hardware configuration.
 
2-29-2012 First light on a back illuminated 1K Frame Shift CCD.  The back side used the LBNL in house pizza process.
2-29-2012 First light on a back illuminated 1K Frame Shift CCD.  The back side used the LBNL in house pizza process.


2-29-2012 Plan on using front side 1K FTFCCD to look for noise sources.  Suspect bias voltages Vdd or VddRst, which are generated in clock module, may be noisy.
2-29-2012 Plan on using front side 1K FTFCCD to look for noise sources.  Suspect bias voltages Vdd or VddRst, which are generated in clock module, may be noisy.

Revision as of 21:18, 18 April 2012

4-3-2012 First x-ray on back illuminated 1K Frame Shift CCD using final hardware configuration.

2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process.

2-29-2012 Plan on using front side 1K FTFCCD to look for noise sources. Suspect bias voltages Vdd or VddRst, which are generated in clock module, may be noisy.