1-9-2013 Detector Head is sitting outside John's office when he arrives at work
1-8-2013 LBL Ships detector Head without buffer chips to APS at noon
11-15-2012 Decide to build two more detector heads without buffer chips and ship one to APS so that we could work in parallel to solve some problems and develop code.  This will make a total of 4 detector heads.
4-3-2012 First x-ray on back illuminated 1K Frame Shift CCD using final hardware configuration.
4-3-2012 First x-ray on back illuminated 1K Frame Shift CCD using final hardware configuration.



Latest revision as of 15:40, 9 January 2013

1-9-2013 Detector Head is sitting outside John's office when he arrives at work

1-8-2013 LBL Ships detector Head without buffer chips to APS at noon

11-15-2012 Decide to build two more detector heads without buffer chips and ship one to APS so that we could work in parallel to solve some problems and develop code. This will make a total of 4 detector heads.

4-3-2012 First x-ray on back illuminated 1K Frame Shift CCD using final hardware configuration.

2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process.

2-29-2012 Plan on using front side 1K FTFCCD to look for noise sources. Suspect bias voltages Vdd or VddRst, which are generated in clock module, may be noisy.