Difference between revisions of "Status"
From Fast CCD Detector
Jump to navigationJump to search (Created page with "2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process. 2-29-2012 Plan on using front side 1K FTFCCD") |
(Quick update) |
||
Line 1: | Line 1: | ||
2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process. | 2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process. | ||
2-29-2012 Plan on using front side 1K FTFCCD | 2-29-2012 Plan on using front side 1K FTFCCD to look for noise sources. Suspect bias voltages Vdd or VddRst, which are generated in clock module, may be noisy. |
Revision as of 20:25, 1 March 2012
2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process.
2-29-2012 Plan on using front side 1K FTFCCD to look for noise sources. Suspect bias voltages Vdd or VddRst, which are generated in clock module, may be noisy.