Difference between revisions of "Status"

From Fast CCD Detector
Jump to navigationJump to search
(Created page with "2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process. 2-29-2012 Plan on using front side 1K FTFCCD")
 
(Quick update)
Line 1: Line 1:
2-29-2012 First light on a back illuminated 1K Frame Shift CCD.  The back side used the LBNL in house pizza process.
2-29-2012 First light on a back illuminated 1K Frame Shift CCD.  The back side used the LBNL in house pizza process.


2-29-2012 Plan on using front side 1K FTFCCD
2-29-2012 Plan on using front side 1K FTFCCD to look for noise sources.  Suspect bias voltages Vdd or VddRst, which are generated in clock module, may be noisy.

Revision as of 20:25, 1 March 2012

2-29-2012 First light on a back illuminated 1K Frame Shift CCD. The back side used the LBNL in house pizza process.

2-29-2012 Plan on using front side 1K FTFCCD to look for noise sources. Suspect bias voltages Vdd or VddRst, which are generated in clock module, may be noisy.